Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Year 2013
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: NW Quad
Start: 20/5/2013 End: 30/5/2013 Person Days: 7.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Condition
Photo type: Before 118221
Image #: 118221
Catalog #:        Accession #: 880
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     Wall in immediate threat of collapsing. Wall is undercutting along the base of the wall.








Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Condition
Photo type: Before 118218
Image #: 118218
Catalog #:        Accession #: 880
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     Wall in immediate threat of collapsing. Wall is undercutting along the base of the wall.








Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Condition
Photo type: Before 118219
Image #: 118219
Catalog #:        Accession #: 880
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     Wall in immediate threat of collapsing. Wall is undercutting along the base of the wall.








Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Treatment
Photo type: After 118314
Image #: 118314
Catalog #:        Accession #: 880
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 24.0
Mortar (# buckets): 0.5
Treatment comment: Deconstructed wall that wasbreaking away from the main exterior kiva wall. All loose/bulging/ or collapsing wall was repaired. Twelve (12) pieces of rebar were placed in the wall for structural re-enforcement. The wall was then built back up by Willard Martinez, Wilmer Martinez, and Robinson Lewis. Seven (7) buckets of cement and 1.5 buckets of mortar were used. Approximately 230 stones were used to rebuild the wall. Harold and Emerson repointed the wall.








Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Treatment
Photo type: During 118377
Image #: 118377
Catalog #:        Accession #: 880
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 24.0
Mortar (# buckets): 0.5
Treatment comment: Deconstructed wall that wasbreaking away from the main exterior kiva wall. All loose/bulging/ or collapsing wall was repaired. Twelve (12) pieces of rebar were placed in the wall for structural re-enforcement. The wall was then built back up by Willard Martinez, Wilmer Martinez, and Robinson Lewis. Seven (7) buckets of cement and 1.5 buckets of mortar were used. Approximately 230 stones were used to rebuild the wall. Harold and Emerson repointed the wall.








Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Treatment
Photo type: During 118378
Image #: 118378
Catalog #:        Accession #: 880
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 24.0
Mortar (# buckets): 0.5
Treatment comment: Deconstructed wall that wasbreaking away from the main exterior kiva wall. All loose/bulging/ or collapsing wall was repaired. Twelve (12) pieces of rebar were placed in the wall for structural re-enforcement. The wall was then built back up by Willard Martinez, Wilmer Martinez, and Robinson Lewis. Seven (7) buckets of cement and 1.5 buckets of mortar were used. Approximately 230 stones were used to rebuild the wall. Harold and Emerson repointed the wall.








Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Treatment
Photo type: During 118379
Image #: 118379
Catalog #:        Accession #: 880
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 24.0
Mortar (# buckets): 0.5
Treatment comment: Deconstructed wall that wasbreaking away from the main exterior kiva wall. All loose/bulging/ or collapsing wall was repaired. Twelve (12) pieces of rebar were placed in the wall for structural re-enforcement. The wall was then built back up by Willard Martinez, Wilmer Martinez, and Robinson Lewis. Seven (7) buckets of cement and 1.5 buckets of mortar were used. Approximately 230 stones were used to rebuild the wall. Harold and Emerson repointed the wall.








Chetro Ketl 29SJ 1928 Room: Kiva C Story: 1st Story Wall: NW Quad Exterior Year 2013
Treatment
Photo type: During 118380
Image #: 118380
Catalog #:        Accession #: 880
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 24.0
Mortar (# buckets): 0.5
Treatment comment: Deconstructed wall that wasbreaking away from the main exterior kiva wall. All loose/bulging/ or collapsing wall was repaired. Twelve (12) pieces of rebar were placed in the wall for structural re-enforcement. The wall was then built back up by Willard Martinez, Wilmer Martinez, and Robinson Lewis. Seven (7) buckets of cement and 1.5 buckets of mortar were used. Approximately 230 stones were used to rebuild the wall. Harold and Emerson repointed the wall.