Chetro Ketl 29SJ 1928 Room: Room 85 Story: 2nd Story Year 2013
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, South
Start: 29/4/2013 End: 3/6/2013 Person Days: 3.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 85 Story: 2nd Story Wall: East Interior Year 2013
Condition
Photo type: Before 118213
Image #: 118213
Catalog #:        Accession #: 880
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Chetro Ketl 29SJ 1928 Room: Room 85 Story: 2nd Story Wall: East Interior Year 2013
Treatment
Photo type: After 118309
Image #: 118309
Catalog #:        Accession #: 880
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 48.0
Masonry: 12.0
Stone replaced (#): 108.0
Stone fresh: 10.0
Mortar (# buckets): 6.0








Chetro Ketl 29SJ 1928 Room: Room 85 Story: 2nd Story Wall: South Interior Year 2013
Condition
Photo type: Before 118214
Image #: 118214
Catalog #:        Accession #: 880
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Chetro Ketl 29SJ 1928 Room: Room 85 Story: 2nd Story Wall: South Interior Year 2013
Treatment
Photo type: After 118310
Image #: 118310
Catalog #:        Accession #: 880
Treatment:
Basal Wall Repair:
Repointing (sq ft): 13.0
Masonry: 13.0
Stone replaced (#): 18.0
Mortar (# buckets): 3.0