Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 14 Story: 1st Story Year 2004
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded:
Start: End: Person Days:
 
Overall Comments: no treatment done - backfill only



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 14 Year 2004
Backfill
Start: Not specified/Not specified/2004 End: Not specified/Not specified/2004 Person days:
Comments: Backfill only, no "walls" created
Specific Information

Cubic yards of fill: 12.0
Backfill source type: BLM Quarry
Backfill other:
Cloth barrier type: Geotextile
Cloth barrier other:
Other textile type:
Other textile other:
Other textile purpose:
Drain Information

Inlet:
T: L: Other: Other type:
Joint:
Y: 90: 45: 22: Other: Other type:
Drain pipe length: feet      Drain pipe diameter: inches
Avgerage height above geotextile: feet     
Drain pipe enters room through:      Other:
Drain pipe leaves room through:      Other:
Drain pipe leaves goes to:     
Evaporative Basins

Basin installed
Height above geotextile: 0.0
Basin size: 18"
Capacity: gallons
Wood

Number of pieces buried: none
Note:


Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 14 Wall: Year 2004
Backfill
Photo type: After Backfill 82621
Image #: 082621
Catalog #:        Accession #: 806