Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Year 2001
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, West
Start: 18/6/2001 End: 18/6/2001 Person Days:
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: South Capping Year 2001
Condition
Condition:
Loose wall caps: Poor
Note:
     Original vertical wall measurements are 8.7 feet (length) and 4.6 (height); exterior 7.1 feet (length) and 7 feet (height).








Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: South Capping Year 2001
Treatment
Treatment:
Capping: 10.5
Treatment comment: Wall is 3 courses. Wall height measures 5.1 feet. Exterior measurements are 8.3 feet and 7.7 feet.








Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: West Capping Year 2001
Condition
Condition:
Loose wall caps: Poor
Note:
     Original vertical wall measurements are 6.6 feet (length) and 4.4 feet (height); exterior 7.3 feet (length) and 11.5 feet(height).








Wijiji 29SJ 577 Room: Room 28 Story: 2nd Story Wall: West Capping Year 2001
Treatment
Treatment:
Capping: 8.1
Treatment comment: Wall is 3 courses. Wall height measures 4.5 feet. Exterior capping measurements are 8.2 (length) and 12.4 (height).