Hungo Pavi 29SJ 1918 Room: Room 2 Story: 2nd Story Year 1996
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Dirt Duraweld C (1:4)
2.0 Sand Duraweld (other)
2.0 Clay
Comments:
Walls recorded: North, North
Start: 2/4/1996 End: 3/4/1996 Person Days: 1.0
 
Overall Comments: North Exterior work started 5-1-1996, work ended 5-1-1996, 1 manday. Type IV Masonry



Hungo Pavi 29SJ 1918 Room: Room 2 Story: 2nd Story Wall: North Exterior Year 1996
Condition
Photo type: Before 104212
Image #: 104212
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor








Hungo Pavi 29SJ 1918 Room: Room 2 Story: 2nd Story Wall: North Exterior Year 1996
Condition
Photo type: Before 104214
Image #: 104214
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor








Hungo Pavi 29SJ 1918 Room: Room 2 Story: 2nd Story Wall: North Exterior Year 1996
Treatment
Photo type: After 103490
Image #: 103490
Catalog #:        Accession #: 751
Treatment:
Repointing (sq ft): 4.0
Stone replaced (#): 10.0
Mortar (# buckets): 1.0








Hungo Pavi 29SJ 1918 Room: Room 2 Story: 2nd Story Wall: North Interior Year 1996
Condition
Condition:
Mortar Erosion: Poor








Hungo Pavi 29SJ 1918 Room: Room 2 Story: 2nd Story Wall: North Interior Year 1996
Treatment
Treatment:
Repointing (sq ft): 3.0
Stone replaced (#): 25.0
Mortar (# buckets): 1.0