Chetro Ketl 29SJ 1928 Room: Room 41 Story: 2nd Story Year 1994
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded:
Start: End: Person Days:
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 41 Year 1994
Backfill
Start: 6/1994 End: 10/1994 Person days:
Comments: No backfill records available.
Specific Information

Cubic yards of fill:
Backfill source type:
Backfill other:
Cloth barrier type:
Cloth barrier other:
Other textile type:
Other textile other:
Other textile purpose:
Drain Information

Inlet:
T: L: Other: Other type:
Joint:
Y: 90: 45: 22: Other: Other type:
Drain pipe length: feet      Drain pipe diameter: inches
Avgerage height above geotextile: feet     
Drain pipe enters room through:      Other:
Drain pipe leaves room through:      Other:
Drain pipe leaves goes to:     
Evaporative Basins

Basin installed
Height above geotextile:
Basin size:
Capacity: gallons
Wood

Number of pieces buried:
Note:


Chetro Ketl 29SJ 1928 Room: Room 41 Wall: North Year 1994
Backfill
Photo type: Before Backfill 105002
Image #: 105002
Catalog #:        Accession #: 708








Chetro Ketl 29SJ 1928 Room: Room 41 Wall: South Year 1994
Backfill
Photo type: Before Backfill 105005
Image #: 105005
Catalog #:        Accession #: 708








Chetro Ketl 29SJ 1928 Room: Room 41 Wall: East Year 1994
Backfill
Photo type: Before Backfill 105004
Image #: 105004
Catalog #:        Accession #: 708