Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 52 B Story: 2nd Story Year 2012
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West, West
Start: 5/6/2012 End: 6/6/2012 Person Days: 1.5
 
Overall Comments:



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 52 B Story: 2nd Story Wall: North Interior Year 2012
Condition
Photo type: Before 117006
Image #: 117006
Catalog #:        Accession #: 867
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 52 B Story: 2nd Story Wall: North Interior Year 2012
Treatment
Photo type: After 117097
Image #: 117097
Catalog #:        Accession #: 867
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 15.0
Masonry: 4.0
Stone replaced (#): 26.0
Mortar (# buckets): 3.0








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 52 B Story: 2nd Story Wall: West Interior Year 2012
Condition
Photo type: Before 117007
Image #: 117007
Catalog #:        Accession #: 867
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 52 B Story: 2nd Story Wall: West Interior Year 2012
Treatment
Photo type: After 117098
Image #: 117098
Catalog #:        Accession #: 867
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 22.0
Mortar (# buckets): 2.0








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 52 B Story: 2nd Story Wall: West Interior Year 2012
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Note:
     Original db Other: Vent Condition Original db Condition: Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 52 B Story: 2nd Story Wall: West Interior Year 2012
Treatment
Photo type: After 117099
Image #: 117099
Catalog #:        Accession #: 867
Treatment:
Repointing (sq ft): 4.0
Masonry: 4.0
Stone replaced (#): 10.0
Stone fresh: 20.0
Mortar (# buckets): 4.0
Treatment comment: Repaired Vent and Installed 2 Beams in Vent.
Other Treatment:
     Repaired Vent
     Installed New Beam