Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Year 2008
Capping Mortars
# of buckets Source Material
1.0 Outside park Dirt Cans Cups of color
5.0 Purchase Sand Describe Color: Brown
Clay Duraweld-C (1:4)
2.0 Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, East, North
Start: 30/9/2008 End: 1/10/2008 Person Days: 1.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: West Exterior Year 2008
Documentation
Photo type: Documentation, No Treatment 84460
Image #: 084460
Catalog #: 93904        Accession #: 811
Documentation:








Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: East Interior Year 2008
Documentation
Photo type: Documentation, No Treatment 84462
Image #: 084462
Catalog #: 93904        Accession #: 811
Documentation:








Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: North Interior Year 2008
Condition
Photo type: Before 84461
Image #: 084461
Catalog #: 93904        Accession #: 811
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor








Wijiji 29SJ 577 Room: Room 26 Story: 2nd Story Wall: North Interior Year 2008
Treatment
Photo type: After
Image #:
Catalog #: 93904        Accession #: 811
Treatment:
Stone replaced (#): 27.0
Capping: 7.0
Mortar (# buckets): 4.5
Treatment comment: Robinson Lewis worked in this room.
Other Treatment:
     Repaired loose and cracked wall
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar