Una Vida 29SJ 391 Room: Room 43 Story: 1st Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
8.0 Outside park Dirt Duraweld C (1:4)
4.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 4/4/2005 End: 5/4/2005 Person Days: 2.0
 
Overall Comments:



Una Vida 29SJ 391 Room: Room 43 Story: 1st Story Wall: West Interior Year 2005
Condition
Photo type: Before 82234
Image #: 082234
Catalog #: 85210        Accession #: 791
Condition:
Loose wall caps: Fair
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Fair
     Loose and cracked Wall Caps Fair








Una Vida 29SJ 391 Room: Room 43 Story: 1st Story Wall: West Interior Year 2005
Treatment
Photo type: No After Photo Available
Image #:
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 5.0
Stone replaced (#): 11.0
Mortar (# buckets): 7.0
Treatment comment: Paul Tso and Jack Trujillo both worked in this room. There is no after photo available but there was work done.
Other Treatment:
     Replaced Mortar
     Repaired loose and cracked wall