Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 65 Story: 1st Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 19/4/2005 End: 19/4/2005 Person Days: 0.5
 
Overall Comments:



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 65 Story: 1st Story Wall: West Interior Year 2005
Treatment
Photo type: After 76271
Image #: 076271
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 9.0
Stone replaced (#): 8.0
Mortar (# buckets): 1.0
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Reset Loose, Leaning, Bulging Lintel Stones








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 65 Story: 1st Story Wall: West Interior Year 2005
Condition
Condition:
Mortar Erosion: Poor
Other Conditions:
     Loose or leaning or bulging masonry Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 65 Story: 1st Story Wall: South Interior Year 2005
Treatment
Photo type: After 76270
Image #: 076270
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 8.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.5
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar
     Replaced Stone(s)








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 65 Story: 1st Story Wall: South Interior Year 2005
Condition
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Eroded Stone(s) Poor
     Basal Erosion (mortar/stone) Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 65 Story: 1st Story Wall: North Exterior Year 2005
Treatment
Photo type: After 76269
Image #: 076269
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 3.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.5
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 65 Story: 1st Story Wall: North Exterior Year 2005
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Other Conditions:
     Basal Erosion (mortar/stone) Poor