Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 24 a Story: 3rd Story Year 1980
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East
Start: 1/10/1980 End: 2/10/1980 Person Days: 3.0
 
Overall Comments:



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 24 a Story: 3rd Story Wall: South Interior Year 1980
Condition
Photo type: Before
Image #: 071182
Catalog #: 94660        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (stone) Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 24 a Story: 3rd Story Wall: South Interior Year 1980
Condition
Photo type: Before
Image #: 071184
Catalog #: 94660        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (stone) Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 24 a Story: 3rd Story Wall: South Interior Year 1980
Treatment
Photo type: After
Image #: 071185
Catalog #: 94660        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 24 a Story: 3rd Story Wall: South Interior Year 1980
Treatment
Photo type: After
Image #: 071183
Catalog #: 94660        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 24 a Story: 3rd Story Wall: East Interior Year 1980
Condition
Photo type: Before
Image #: 071186
Catalog #: 94660        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Basal Erosion (stone) Poor
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 24 a Story: 3rd Story Wall: East Interior Year 1980
Treatment
Photo type: After
Image #: 071187
Catalog #: 94660        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar