Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
1.0 Local source Dirt Cans Cups of color
2.0 Purchase Sand Describe Color: Light Brown
Clay Duraweld-C (1:4)
1.0 Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Local source Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East, North
Start: 29/3/2006 End: 1/4/2006 Person Days: 2.5
 
Overall Comments:



Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: West Interior Year 2006
Condition
Photo type: Before 82335
Image #: 082335
Catalog #: 85196        Accession #: 803
Condition:
Loose wall caps: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: West Interior Year 2006
Condition
Photo type: Before 82336
Image #: 082336
Catalog #: 85196        Accession #: 803
Condition:
Loose wall caps: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: West Interior Year 2006
Treatment
Photo type: After 82361
Image #: 082361
Catalog #: 85196        Accession #: 803
Treatment:
Repointing (sq ft): 10.0
Mortar (# buckets): 1.5
Other Treatment:
     Capping Installed








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: South Interior Year 2006
Condition
Photo type: Before 82334
Image #: 082334
Catalog #: 85196        Accession #: 803
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Loose and cracked Wall Caps Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: South Interior Year 2006
Treatment
Photo type: After 82723
Image #: 082723
Catalog #: 85196        Accession #: 803
Treatment:
Repointing (sq ft): 6.0
Mortar (# buckets): 2.0
Treatment comment: The after photo for the South Wall is in the process of being retaken.
Other Treatment:
     Capping Installed
     Replaced Mortar








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: East Interior Year 2006
Condition
Photo type: Before 82332
Image #: 082332
Catalog #: 85196        Accession #: 803
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor
     Mortar Erosion Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: East Interior Year 2006
Condition
Photo type: Before 82333
Image #: 082333
Catalog #: 85196        Accession #: 803
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor
     Mortar Erosion Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: East Interior Year 2006
Treatment
Photo type: After 82358
Image #: 082358
Catalog #: 85196        Accession #: 803
Treatment:
Repointing (sq ft): 25.0
Mortar (# buckets): 2.0
Other Treatment:
     Capping Installed
     Capping Installed
     Replaced Mortar








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: East Interior Year 2006
Treatment
Photo type: After 82359
Image #: 082359
Catalog #: 85196        Accession #: 803
Treatment:
Repointing (sq ft): 25.0
Mortar (# buckets): 2.0
Other Treatment:
     Capping Installed
     Capping Installed
     Replaced Mortar








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: North Interior Year 2006
Condition
Photo type: Before 82331
Image #: 082331
Catalog #: 85196        Accession #: 803
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor
     Mortar Erosion Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Structure 01 Story: 1st Story Wall: North Interior Year 2006
Treatment
Photo type: After 82360
Image #: 082360
Catalog #: 85196        Accession #: 803
Treatment:
Repointing (sq ft): 28.0
Stone replaced (#): 30.0
Capping: 40.0
Mortar (# buckets): 10.0
Other Treatment:
     Capping Installed
     Capping Installed
     Replaced Mortar