Kin Bineola 29SJ 1580 Room: Room 103 Story: 2nd Story Year 2006
Capping Mortars
# of buckets Source Material
2.0 Outside park Dirt Cans Cups of color
1.0 Purchase Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, East
Start: 17/5/2006 End: 18/5/2006 Person Days: 1.5
 
Overall Comments:



Kin Bineola 29SJ 1580 Room: Room 103 Story: 2nd Story Wall: West Exterior Year 2006
Condition
Photo type: Before 82458
Image #: 082458
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 103 Story: 2nd Story Wall: West Exterior Year 2006
Treatment
Photo type: After 82931
Image #: 082931
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 60.0
Masonry: 10.0
Stone replaced (#): 28.0
Mortar (# buckets): 2.0
Treatment comment: Harold Suina worked in this room.
Other Treatment:
     Replaced Mortar








Kin Bineola 29SJ 1580 Room: Room 103 Story: 2nd Story Wall: East Interior Year 2006
Condition
Photo type: Before 82459
Image #: 082459
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 103 Story: 2nd Story Wall: East Interior Year 2006
Treatment
Photo type: After
Image #: 082930
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 14.0
Masonry: 3.0
Stone replaced (#): 10.0
Mortar (# buckets): 1.0
Treatment comment: Harold Suina worked in this room.
Other Treatment:
     Replaced Mortar