Pueblo Bonito 29SJ 387 Room: Room 35 Story: 1st Story Year 2010
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 15/4/2010 End: 26/4/2010 Person Days: 2.0
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 35 Story: 1st Story Wall: West Interior Year 2010
Condition
Photo type: Before 95135
Image #: 095135
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 35 Story: 1st Story Wall: West Interior Year 2010
Treatment
Photo type: After 95246
Image #: 095246
Catalog #:        Accession #: 840
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 18.0
Stone replaced (#): 5.0
Mortar (# buckets): 1.0








Pueblo Bonito 29SJ 387 Room: Room 35 Story: 1st Story Wall: South Interior Year 2010
Condition
Photo type: Before 95134
Image #: 095134
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 35 Story: 1st Story Wall: North Interior Year 2010
Condition
Photo type: Before 95136
Image #: 095136
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 35 Story: 1st Story Wall: North Interior Year 2010
Treatment
Photo type: After 95244
Image #: 095244
Catalog #:        Accession #: 840
Treatment:
Repointing (sq ft): 36.0
Stone replaced (#): 6.0
Mortar (# buckets): 0.5