Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Year 1971
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East, North
Start: 27/9/1971 End: 6/10/1971 Person Days: 19.5
 
Overall Comments:



Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: West Interior Year 1971
Treatment
Photo type: Form Vol_59_v59_343
Image #: f10113
Catalog #:        Accession #:
Treatment:








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: West Interior Year 1971
Condition
Photo type: Before Vol_59_v59_346
Image #: 065508
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Mortar Erosion
     Respalling
     Repatch wall
     Needs Repointing








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: West Interior Year 1971
Treatment
Photo type: After Vol_59_v59_347
Image #: 065509
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Respalling Completed
     Repointing completed
     Repatched Wall
     Replaced Mortar








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: South Interior Year 1971
Condition
Photo type: Before Vol_59_v59_352
Image #: 065514
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Needs Repointing
     Mortar Erosion
     Repatch wall
     Respalling








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: South Interior Year 1971
Treatment
Photo type: Form Vol_59_v59_343
Image #: f10113
Catalog #:        Accession #:
Treatment:








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: South Interior Year 1971
Treatment
Photo type: After Vol_59_v59_353
Image #: 065515
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Respalling Completed
     Repointing completed
     Replaced Mortar
     Repatched Wall








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: South Interior Year 1971
Condition
Photo type: Before Vol_59_v59_354
Image #: 065516
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Needs Repointing
     Mortar Erosion
     Repatch wall
     Respalling








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: South Interior Year 1971
Treatment
Photo type: After Vol_59_v59_355
Image #: 065517
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Respalling Completed
     Repointing completed
     Replaced Mortar
     Repatched Wall








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: East Interior Year 1971
Treatment
Photo type: Form Vol_59_v59_343
Image #: f10113
Catalog #:        Accession #:
Treatment:








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: East Interior Year 1971
Condition
Photo type: Before Vol_59_v59_344
Image #: 065506
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Respalling
     Needs Repointing








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: East Interior Year 1971
Treatment
Photo type: After Vol_59_v59_345
Image #: 065507
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Repointing completed
     Respalling Completed








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: North Interior Year 1971
Treatment
Photo type: Form Vol_59_v59_343
Image #: f10113
Catalog #:        Accession #:
Treatment:








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: North Interior Year 1971
Treatment
Photo type: After Vol_59_v59_351
Image #: 065513
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Reset the Stone(s)
     Drainage Pipe Installation
     Repointing completed
     Repatched Wall
     Respalling Completed
     Replaced Mortar








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: North Interior Year 1971
Condition
Photo type: Before Vol_59_v59_348
Image #: 065510
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Loose Stone(s)
     Repatch wall
     Drainage Pipe Installation
     Mortar Erosion
     Needs Repointing
     Respalling








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: North Interior Year 1971
Treatment
Photo type: After Vol_59_v59_349
Image #: 065511
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Reset the Stone(s)
     Drainage Pipe Installation
     Repointing completed
     Repatched Wall
     Respalling Completed
     Replaced Mortar








Una Vida 29SJ 391 Room: Room 21 Story: 1st Story Wall: North Interior Year 1971
Condition
Photo type: Before Vol_59_v59_350
Image #: 065512
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Loose Stone(s)
     Repatch wall
     Drainage Pipe Installation
     Mortar Erosion
     Needs Repointing
     Respalling