Kin Bineola 29SJ 1580 Room: Room 2 Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
2.0 Outside park Dirt Cans Cups of color
1.0 Purchase Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 3/5/2006 End: 4/5/2006 Person Days: 0.5
 
Overall Comments:



Kin Bineola 29SJ 1580 Room: Room 2 Story: 1st Story Wall: West Interior Year 2006
Condition
Photo type: Before 82443
Image #: 082443
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 2 Story: 1st Story Wall: West Interior Year 2006
Treatment
Photo type: After 75741
Image #: 075741
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.5
Treatment comment: Paul Tso worked in this room.
Other Treatment:
     Replaced Mortar








Kin Bineola 29SJ 1580 Room: Room 2 Story: 1st Story Wall: South Interior Year 2006
Treatment
Photo type: After 75742
Image #: 075742
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 3.0
Masonry: 4.0
Mortar (# buckets): 0.5
Treatment comment: Paul Tso worked in this room.
Other Treatment:
     Replaced Mortar








Kin Bineola 29SJ 1580 Room: Room 2 Story: 1st Story Wall: South Interior Year 2006
Condition
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 2 Story: 1st Story Wall: North Interior Year 2006
Condition
Photo type: Before 82442
Image #: 082442
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 2 Story: 1st Story Wall: North Interior Year 2006
Treatment
Photo type: After 75740
Image #: 075740
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 6.0
Masonry: 2.0
Mortar (# buckets): 0.5
Treatment comment: Paul Tso worked in this room.
Other Treatment:
     Replaced Mortar