Wijiji 29SJ 577 Room: Room 4 Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 29/9/2008 End: 27/10/2008 Person Days: 2.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 4 Story: 1st Story Wall: West Interior Year 2008
Condition
Photo type: Before 84421
Image #: 084421
Catalog #: 93904        Accession #: 811
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (mortar/stone) Poor








Wijiji 29SJ 577 Room: Room 4 Story: 1st Story Wall: West Interior Year 2008
Treatment
Photo type: After 84580
Image #: 084580
Catalog #: 93904        Accession #: 811
Treatment:
Repointing (sq ft): 20.0
Stone replaced (#): 32.0
Capping: 2.0
Mortar (# buckets): 5.5
Treatment comment: Garry Joe and Ben Chrley both worked in this room.
Other Treatment:
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)