Hungo Pavi 29SJ 1918 Room: Room 16 Story: 3rd Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
2.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 10/3/2005 End: 21/3/2005 Person Days: 4.0
 
Overall Comments:



Hungo Pavi 29SJ 1918 Room: Room 16 Story: 3rd Story Wall: West Interior Year 2005
Condition
Photo type: Before 75990
Image #: 075990
Catalog #: 85206        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Mortar Erosion Poor








Hungo Pavi 29SJ 1918 Room: Room 16 Story: 3rd Story Wall: West Interior Year 2005
Treatment
Photo type: No After Photo Available
Image #:
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 5.0
Masonry: 7.0
Stone replaced (#): 6.0
Mortar (# buckets): 0.5








Hungo Pavi 29SJ 1918 Room: Room 16 Story: 3rd Story Wall: South Interior Year 2005
Condition
Photo type: Before 75991
Image #: 075991
Catalog #: 85206        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Mortar Erosion Poor








Hungo Pavi 29SJ 1918 Room: Room 16 Story: 3rd Story Wall: South Interior Year 2005
Treatment
Photo type: No After Photo Available
Image #:
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 13.0
Masonry: 9.0
Stone replaced (#): 5.0
Mortar (# buckets): 0.5








Hungo Pavi 29SJ 1918 Room: Room 16 Story: 3rd Story Wall: North Interior Year 2005
Condition
Photo type: Before 75989
Image #: 075989
Catalog #: 85206        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Eroded Stone(s) Poor








Hungo Pavi 29SJ 1918 Room: Room 16 Story: 3rd Story Wall: North Interior Year 2005
Treatment
Photo type: No After Photo Available
Image #:
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 12.0
Masonry: 5.0
Stone replaced (#): 14.0
Mortar (# buckets): 1.0