Pueblo Bonito 29SJ 387 | Room: Room 156 | Story: 1st Story | Year 2007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Walls recorded: South | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overall Comments: |
Pueblo Bonito 29SJ 387 | Room: Room 156 | Story: 1st Story | Wall: South | Exterior | Year 2007 |
Condition: |
Mortar Erosion: Poor |
Other Conditions: |
Mortar Erosion Poor |
Pueblo Bonito 29SJ 387 | Room: Room 156 | Story: 1st Story | Wall: South | Exterior | Year 2007 |
Treatment: |
Repointing (sq ft): 14.0 |
Stone replaced (#): 5.0 |
Mortar (# buckets): 2.0 |
Treatment comment: Harold Suina worked in this room. There is no after photo available because Ben said that the room was covered but the wall was treated (worked on). |
Other Treatment: |
Replaced Mortar |