Wijiji 29SJ 577 Room: Room 79 Story: 2nd Story Year 2001
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 18/4/2011 End: 19/4/2011 Person Days: 2.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 79 Story: 2nd Story Wall: West Interior Year 2001
Condition
Photo type: Before 107851
Image #: 107851
Catalog #:        Accession #: 854
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 79 Story: 2nd Story Wall: West Interior Year 2001
Treatment
Photo type: After 107951
Image #: 107951
Catalog #:        Accession #: 854
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 13.0
Stone replaced (#): 7.0
Mortar (# buckets): 2.0








Wijiji 29SJ 577 Room: Room 79 Story: 2nd Story Wall: South Interior Year 2001
Condition
Photo type: Before 107853
Image #: 107853
Catalog #:        Accession #: 854
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 79 Story: 2nd Story Wall: South Interior Year 2001
Treatment
Photo type: After 107950
Image #: 107950
Catalog #:        Accession #: 854
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 2.6
Mortar (# buckets): 0.5








Wijiji 29SJ 577 Room: Room 79 Story: 2nd Story Wall: North Interior Year 2001
Condition
Photo type: Before 107852
Image #: 107852
Catalog #:        Accession #: 854
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 79 Story: 2nd Story Wall: North Interior Year 2001
Treatment
Photo type: After 107952
Image #: 107952
Catalog #:        Accession #: 854
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 14.0
Mortar (# buckets): 0.5