Wijiji 29SJ 577 Room: Room 59 Story: 2nd Story Year 2011
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West
Start: 25/4/2011 End: 25/4/2011 Person Days: 0.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 59 Story: 2nd Story Wall: West Interior Year 2011
Treatment
Photo type: After 107985
Image #: 107985
Catalog #:        Accession #: 854
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 9.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5








Wijiji 29SJ 577 Room: Room 59 Story: 2nd Story Wall: West Interior Year 2011
Condition
Photo type: Before 107849
Image #: 107849
Catalog #:        Accession #: 854
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor
Note: