Wijiji 29SJ 577 Room: Room 57 Story: 2nd Story Year 2011
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, North
Start: 25/4/2011 End: 3/5/2011 Person Days: 6.5
 
Overall Comments: covering 2 documents



Wijiji 29SJ 577 Room: Room 57 Story: 2nd Story Wall: North Interior Year 2011
Condition
Photo type: Before 107882
Image #: 107882
Catalog #:        Accession #: 854
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Wijiji 29SJ 577 Room: Room 57 Story: 2nd Story Wall: North Interior Year 2011
Treatment
Photo type: After 107979
Image #: 107979
Catalog #:        Accession #: 854
Treatment:
Repointing (sq ft): 40.0
Mortar (# buckets): 2.0








Wijiji 29SJ 577 Room: Room 57 Story: 2nd Story Wall: North Exterior Year 2011
Condition
Photo type: Before 107922
Image #: 107922
Catalog #:        Accession #: 854
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Wijiji 29SJ 577 Room: Room 57 Story: 2nd Story Wall: North Exterior Year 2011
Treatment
Photo type: After 107999
Image #: 107999
Catalog #:        Accession #: 854
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 60.0
Mortar (# buckets): 4.5