Pueblo Pintado 29Mc 166 Room: Room 8 A Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, North
Start: 23/9/2008 End: 23/9/2008 Person Days: 0.5
 
Overall Comments:



Pueblo Pintado 29Mc 166 Room: Room 8 A Story: 1st Story Wall: East Interior Year 2008
Condition
Photo type: Before 84338
Image #: 084338
Catalog #: 93902        Accession #: 811
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Pueblo Pintado 29Mc 166 Room: Room 8 A Story: 1st Story Wall: East Interior Year 2008
Treatment
Photo type: After 84490
Image #: 084490
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 6.0
Mortar (# buckets): 0.5
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)








Pueblo Pintado 29Mc 166 Room: Room 8 A Story: 1st Story Wall: North Interior Year 2008
Condition
Photo type: Before 84337
Image #: 084337
Catalog #: 93902        Accession #: 811
Condition:
Mortar Erosion: Poor
Other Conditions:
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor
     Eroded Stone(s) Poor








Pueblo Pintado 29Mc 166 Room: Room 8 A Story: 1st Story Wall: North Interior Year 2008
Treatment
Photo type: After 84489
Image #: 084489
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 12.0
Mortar (# buckets): 0.5
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Replaced Stone(s)
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)