Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Year 1974
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color: Desert Tan
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 14/8/1974 End: 15/8/1974 Person Days: 1.5
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: East Year 1974
Condition
Photo type: Before Vol_73_v73_309
Image #: 067694
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Basal Erosion
     Mortar Erosion
     Needs Repointing








Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: East Year 1974
Treatment
Photo type: After Vol_73_v73_310
Image #: 067695
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar
     Repointing completed








Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: East Year 1974
Treatment
Photo type: Form Vol_73_v73_308
Image #: f03977
Catalog #:        Accession #:
Treatment:








Bc 51 29SJ 395 Room: Room 40 Story: 1st Story Wall: East Year 1974
Treatment
Photo type: Form Vol_73_v73_307
Image #: f03978
Catalog #:        Accession #:
Treatment: