Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Year 1984
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 18/9/1984 End: 19/9/1984 Person Days: 2.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1984
Condition
Photo type: Before 87095
Image #: 087095
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1984
Treatment
Photo type: After Vol_93_dsc_loose_0160
Image #: 086994
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Treatment comment: Patched and grouted where needed in resin mud mortar








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1984
Condition
Photo type: Before 87096
Image #: 087096
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1984
Treatment
Photo type: After 86957
Image #: 086957
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Treatment comment: Patched and grouted where needed in resin mud mortar








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1984
Treatment
Photo type: After 86958
Image #: 086958
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Treatment comment: Patched and grouted where needed in resin mud mortar