Bc 51 29SJ 395 Room: Room 15 Story: 1st Story Year 1984
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 17/9/1984 End: 18/9/1984 Person Days: 1.5
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 15 Story: 1st Story Wall: West Interior Year 1984
Condition
Photo type: Before 87081
Image #: 087081
Catalog #:        Accession #:
Condition:
Mortar Erosion: Heavy








Bc 51 29SJ 395 Room: Room 15 Story: 1st Story Wall: West Interior Year 1984
Treatment
Photo type: After Vol_97_dsc_loose_0034
Image #: 086989
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Treatment comment: Patched where needed in resin mud mortar








Bc 51 29SJ 395 Room: Room 15 Story: 1st Story Wall: South Exterior Year 1984
Treatment
Photo type: After 86934
Image #: 086934
Catalog #:        Accession #:
Treatment:








Bc 51 29SJ 395 Room: Room 15 Story: 1st Story Wall: North Interior Year 1984
Condition
Photo type: Before 87094
Image #: 087094
Catalog #:        Accession #:
Condition:
Stone Erosion: Heavy
Mortar Erosion: Heavy
Basal Erosion: Poor








Bc 51 29SJ 395 Room: Room 15 Story: 1st Story Wall: North Interior Year 1984
Treatment
Photo type: After 86988
Image #: 086988
Catalog #:        Accession #:
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Treatment comment: Patched and grouted where needed in resin mud mortar