Wijiji 29SJ 577 Room: Room 5 Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
1.0 Outside park Dirt Cans Cups of color
5.0 Purchase Sand Describe Color: Brown
Clay Duraweld-C (1:4)
2.0 Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, North
Start: 25/9/2008 End: 22/10/2008 Person Days: 2.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 5 Story: 1st Story Wall: East Interior Year 2008
Condition
Photo type: Before 84420
Image #: 084420
Catalog #: 93904        Accession #: 811
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (mortar/stone) Poor
     Loose and cracked Wall Caps Poor








Wijiji 29SJ 577 Room: Room 5 Story: 1st Story Wall: East Interior Year 2008
Treatment
Photo type: After 84553
Image #: 084553
Catalog #: 93904        Accession #: 811
Treatment:
Repointing (sq ft): 74.3
Masonry: 12.0
Capping: 28.0
Mortar (# buckets): 3.5
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Repaired loose and cracked wall
     Replaced Mortar








Wijiji 29SJ 577 Room: Room 5 Story: 1st Story Wall: North Interior Year 2008
Condition
Photo type: Before 84419
Image #: 084419
Catalog #: 93904        Accession #: 811
Condition:
Loose wall caps: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor








Wijiji 29SJ 577 Room: Room 5 Story: 1st Story Wall: North Interior Year 2008
Treatment
Photo type: After 84554
Image #: 084554
Catalog #: 93904        Accession #: 811
Treatment:
Masonry: 26.0
Capping: 10.5
Mortar (# buckets): 4.5
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Repaired loose and cracked wall