Chetro Ketl 29SJ 1928 Room: Room 84 Story: 1st Story Year 1980
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 29/7/1980 End: 1/8/1980 Person Days: 4.0
 
Overall Comments:



Chetro Ketl 29SJ 1928 Room: Room 84 Story: 1st Story Wall: East Year 1980
Condition
Photo type: Before
Image #: 071444
Catalog #: 94665        Accession #: 745
Condition:
Mortar Erosion: Extreme
Basal Erosion: Extreme
Other Conditions:
     Basal Erosion Extreme
     Mortar Erosion Extreme
     Veneer Stone Erosion Extreme
     Needs Repointing Poor
     Repatch wall Poor








Chetro Ketl 29SJ 1928 Room: Room 84 Story: 1st Story Wall: East Year 1980
Treatment
Photo type: After
Image #: 071445
Catalog #: 94665        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 part soil, 1 part sand and 1 part cement
Other Treatment:
     Replaced Mortar
     Repointing completed
     Repatched Wall
     Replaced Veneer stone erosion
     Repaired Basal erosion (mortar/stone)