Bc 51 29SJ 395 Room: Room 31/ 32/ 10 Story: 1st Story Year 1971
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 13/5/1971 End: 14/5/1971 Person Days: 1.5
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 31/ 32/ 10 Story: 1st Story Wall: North Interior Year 1971
Condition
Photo type: Before Vol_59_v59_053
Image #: 065319
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Eroded Stone(s)
     Repatch wall
     Needs Repointing
     Basal Erosion








Bc 51 29SJ 395 Room: Room 31/ 32/ 10 Story: 1st Story Wall: North Interior Year 1971
Treatment
Photo type: After Vol_59_v59_054
Image #: 065320
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Repatched Wall
     Replaced Stone(s)
     Repaired Basal erosion (mortar/stone)
     Repointing completed