Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Year 2000
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East, North
Start: 4/2000 End: 2000 Person Days:
 
Overall Comments: Record created to document photos without paper documentation. Some photos were entered in both the wall treatment and backfill section, because the photo showed that the wall was treated and showed the wall before backfill.



Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: West Interior Year 2000
Condition
Photo type: Before 100730
Image #: 100730
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: West Interior Year 2000
Treatment
Photo type: After 100633
Image #: 100633
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: South Interior Year 2000
Condition
Photo type: Before 100819
Image #: 100819
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: South Interior Year 2000
Condition
Photo type: Before 100820
Image #: 100820
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: South Interior Year 2000
Treatment
Photo type: After 100632
Image #: 100632
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work.








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: East Interior Year 2000
Condition
Photo type: Before 100818
Image #: 100818
Catalog #:        Accession #:
Condition:
Mortar Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: East Interior Year 2000
Treatment
Photo type: After 100631
Image #: 100631
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work.








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: North Interior Year 2000
Condition
Photo type: Before 100732
Image #: 100732
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: North Interior Year 2000
Treatment
Photo type: After 100634
Image #: 100634
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Kin Kletso 29SJ 393 Room: Room 31 Story: 1st Story Wall: North Interior Year 2000
Condition
Photo type: Before 100731
Image #: 100731
Catalog #:        Accession #:
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Kin Kletso 29SJ 393 Room: Room 31 Year 2000
Backfill
Start: 4/2000 End: 2000 Person days:
Comments: No backfill documentation available. Backfill information was collected from photographic documentation or drainage maps. "After backfill" photos were orginally entered into database as a 2001 project, but the photos were part of the 2000 backfill project. The 2001 "after backfill" photos were merged into the Kin Kletso 2000 preservation records.
Specific Information

Cubic yards of fill:
Backfill source type:
Backfill other:
Cloth barrier type:
Cloth barrier other:
Other textile type:
Other textile other:
Other textile purpose:
Drain Information

Inlet:
T: L: Other: Other type:
Joint:
Y: 90: 45: 22: Other: Other type:
Drain pipe length: feet      Drain pipe diameter: inches
Avgerage height above geotextile: feet     
Drain pipe enters room through: Originates in Room      Other:
Drain pipe leaves room through: Doorway      Other:
Drain pipe leaves goes to: Room 42     
Evaporative Basins

Basin installed
Height above geotextile:
Basin size:
Capacity: gallons
Wood

Number of pieces buried:
Note:


Kin Kletso 29SJ 393 Room: Room 31 Wall: East Year 2000
Backfill
Photo type: During Backfill 100813
Image #: 100813
Catalog #:        Accession #:








Kin Kletso 29SJ 393 Room: Room 31 Wall: North Year 2000
Backfill
Photo type: Before Backfill 100634
Image #: 100634
Catalog #:        Accession #:








Kin Kletso 29SJ 393 Room: Room 31 Wall: West Year 2000
Backfill
Photo type: Before Backfill 100633
Image #: 100633
Catalog #:        Accession #:








Kin Kletso 29SJ 393 Room: Room 31 Wall: East Year 2000
Backfill
Photo type: Before Backfill 100631
Image #: 100631
Catalog #:        Accession #:








Kin Kletso 29SJ 393 Room: Room 31 Wall: South Year 2000
Backfill
Photo type: Before Backfill 100632
Image #: 100632
Catalog #:        Accession #:








Kin Kletso 29SJ 393 Room: Room 31 Wall: West Year 2000
Backfill
Photo type: After Backfill 99289
Image #: 099289
Catalog #:        Accession #: 756








Kin Kletso 29SJ 393 Room: Room 31 Wall: South Year 2000
Backfill
Photo type: After Backfill 99291
Image #: 099291
Catalog #:        Accession #: 756








Kin Kletso 29SJ 393 Room: Room 31 Wall: South Year 2000
Backfill
Photo type: After Backfill 99294
Image #: 099294
Catalog #:        Accession #: 756








Kin Kletso 29SJ 393 Room: Room 31 Wall: South Year 2000
Backfill
Photo type: After Backfill 99295
Image #: 099295
Catalog #:        Accession #: 756








Kin Kletso 29SJ 393 Room: Room 31 Wall: East Year 2000
Backfill
Photo type: After Backfill 99290
Image #: 099290
Catalog #:        Accession #: 756








Kin Kletso 29SJ 393 Room: Room 31 Wall: North Year 2000
Backfill
Photo type: After Backfill 99292
Image #: 099292
Catalog #:        Accession #: 756








Kin Kletso 29SJ 393 Room: Room 31 Wall: North Year 2000
Backfill
Photo type: After Backfill 99293
Image #: 099293
Catalog #:        Accession #: 756