Clyde Pablo Trading Post 29SJ 2459 Room: Slab Fire Box Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, North
Start: 30/3/2006 End: 6/2006 Person Days:
 
Overall Comments:



Clyde Pablo Trading Post 29SJ 2459 Room: Slab Fire Box Story: 1st Story Wall: West Interior Year 2006
Condition
Photo type: Before 82337
Image #: 082337
Catalog #: 85196        Accession #: 803
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Slab Fire Box Story: 1st Story Wall: West Interior Year 2006
Treatment
Photo type: After 82363
Image #: 082363
Catalog #: 85196        Accession #: 803
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 5.0
Stone replaced (#): 5.0
Mortar (# buckets): 1.0








Clyde Pablo Trading Post 29SJ 2459 Room: Slab Fire Box Story: 1st Story Wall: South Interior Year 2006
Treatment
Photo type: After 82364
Image #: 082364
Catalog #: 85196        Accession #: 803
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 3.0
Stone replaced (#): 3.0
Mortar (# buckets): 1.0








Clyde Pablo Trading Post 29SJ 2459 Room: Slab Fire Box Story: 1st Story Wall: South Interior Year 2006
Condition
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor








Clyde Pablo Trading Post 29SJ 2459 Room: Slab Fire Box Story: 1st Story Wall: North Interior Year 2006
Treatment
Photo type: After 82362
Image #: 082362
Catalog #: 85196        Accession #: 803
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 60.0
Capping: 22.5
Mortar (# buckets): 5.0
Treatment comment: mud 2 bkt, cement 3 bkt








Clyde Pablo Trading Post 29SJ 2459 Room: Slab Fire Box Story: 1st Story Wall: North Interior Year 2006
Condition
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor