Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Year 2002
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, West, South, East, North
Start: 29/5/2002 End: 5/2002 Person Days: 1.0
 
Overall Comments: THIS RECORD ENTERED FOR THE 2ND TIME AT 1-20-11. DISAPPEARO INFO, NOT SHOWN AT LOG-OUT/LOG BACK IN......Some information created to enter photos without paper documentation. Condition assessment completed for room but there was no treatment done.



Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: West Capping Year 2002
Treatment
Photo type: After 98129
Image #: 098129
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 21.33
Masonry: 8.0
Mortar (# buckets): 3.0








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: West Capping Year 2002
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor
Note:
     








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: West Capping Year 2002
Condition
Photo type: Before 98138
Image #: 098138
Catalog #:        Accession #:
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor
Other Conditions:
     No Treatment Done








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: South Capping Year 2002
Condition
Photo type: Before 98095
Image #: 098095
Catalog #:        Accession #:
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: South Capping Year 2002
Treatment
Photo type: After 98128
Image #: 098128
Catalog #:        Accession #:
Treatment:
Treatment comment: Capping was repaired with mortar and stone where needed.








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: East Capping Year 2002
Treatment
Photo type: After 98126
Image #: 098126
Catalog #:        Accession #:
Treatment:
Treatment comment: Capping was repaired with mortar and stone where needed.








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: East Capping Year 2002
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: North Capping Year 2002
Condition
Photo type: Before 98137
Image #: 098137
Catalog #:        Accession #:
Condition:
Loose wall caps: Poor
Mortar Erosion: Poor








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 2nd Story Wall: North Capping Year 2002
Treatment
Photo type: After 98130
Image #: 098130
Catalog #:        Accession #:
Treatment:
Treatment comment: Capping was repaired with mortar and stone where needed.