Bc 51 29SJ 395 Room: Room 48 Story: 1st Story Year 1979
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Dirt Duraweld C (1:4)
1.0 Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East
Start: 20/8/1979 End: 21/8/1979 Person Days: 2.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 48 Story: 1st Story Wall: South Interior Year 1979
Condition
Photo type: Before
Image #: 070909
Catalog #: 66777        Accession #: 744
Condition:
Other Conditions:
     Basal Erosion
     Needs Repointing
     Mortar Erosion
     Eroded Stone(s)
     Repatch wall








Bc 51 29SJ 395 Room: Room 48 Story: 1st Story Wall: South Interior Year 1979
Treatment
Photo type: After
Image #: 070910
Catalog #: 66777        Accession #: 744
Treatment:
Other Treatment:
     Repatched Wall
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar
     Repointing completed
     Replaced Stone(s)








Bc 51 29SJ 395 Room: Room 48 Story: 1st Story Wall: East Interior Year 1979
Condition
Photo type: Before
Image #: 070911
Catalog #: 66777        Accession #: 744
Condition:
Other Conditions:
     Mortar Erosion
     Basal Erosion
     Needs Repointing
     Repatch wall








Bc 51 29SJ 395 Room: Room 48 Story: 1st Story Wall: East Interior Year 1979
Treatment
Photo type: After
Image #: 070912
Catalog #: 66777        Accession #: 744
Treatment:
Other Treatment:
     Replaced Mortar
     Repatched Wall
     Repaired Basal erosion (mortar/stone)
     Repointing completed