Hungo Pavi 29SJ 1918 Room: Room 14 Story: 1st Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
2.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, North
Start: 9/3/2005 End: 11/3/2005 Person Days: 2.0
 
Overall Comments:



Hungo Pavi 29SJ 1918 Room: Room 14 Story: 1st Story Wall: South Interior Year 2005
Condition
Photo type: Before 75988
Image #: 075987
Catalog #: 85206        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor








Hungo Pavi 29SJ 1918 Room: Room 14 Story: 1st Story Wall: South Interior Year 2005
Treatment
Photo type: No After Photo Available
Image #:
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 4.0
Stone replaced (#): 2.0
Mortar (# buckets): 1.0
Treatment comment: Jack Trujillo worked in this room. There is no after photo available but the work was done.
Other Treatment:
     Replaced Stone(s)
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)








Hungo Pavi 29SJ 1918 Room: Room 14 Story: 1st Story Wall: North Exterior Year 2005
Condition
Photo type: Before 75988
Image #: 075988
Catalog #: 85206        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor








Hungo Pavi 29SJ 1918 Room: Room 14 Story: 1st Story Wall: North Exterior Year 2005
Treatment
Photo type: No After Photo Available
Image #:
Catalog #:        Accession #:
Treatment:
Repointing (sq ft): 8.0
Stone replaced (#): 2.0
Mortar (# buckets): 1.0
Treatment comment: Jack Trujillo worked in this room. There is no after photo available but the work was done.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Stone(s)
     Replaced Mortar