Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 1st Story Year 2007
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Outside park Dirt Duraweld C (1:4)
0.5 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, East
Start: 9/10/2007 End: 9/10/2007 Person Days: 1.0
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 1st Story Wall: West Interior Year 2007
Condition
Photo type: Before 83532
Image #: 083532
Catalog #: 85211        Accession #: 806
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 1st Story Wall: West Interior Year 2007
Treatment
Photo type: After 83640
Image #: 083640
Catalog #: 85211        Accession #: 806
Treatment:
Repointing (sq ft): 76.0
Stone replaced (#): 4.0
Mortar (# buckets): 0.75
Treatment comment: Douglas Norberto Sr. worked in this room.








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 1st Story Wall: East Interior Year 2007
Condition
Photo type: Before 83643
Image #: 083643
Catalog #: 85211        Accession #: 806
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Bc 50-Tseh So 29SJ 394 Room: Room 7 Story: 1st Story Wall: East Interior Year 2007
Treatment
Photo type: After 83645
Image #: 083645
Catalog #: 85211        Accession #: 806
Treatment:
Repointing (sq ft): 37.0
Stone replaced (#): 3.0
Mortar (# buckets): 0.25
Treatment comment: Douglas Norberto Sr. worked in this room.