Una Vida 29SJ 391 Room: Room 27 Story: 2nd Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
8.0 Outside park Dirt Duraweld C (1:4)
2.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: North
Start: 28/3/2005 End: 28/3/2005 Person Days: 1.0
 
Overall Comments:



Una Vida 29SJ 391 Room: Room 27 Story: 2nd Story Wall: North Interior Year 2005
Treatment
Treatment:
Repointing (sq ft): 28.0
Masonry: 5.0
Stone replaced (#): 25.0
Mortar (# buckets): 1.0
Treatment comment: Harold Suina worked in this room. There is no after photo available but the work was done.
Other Treatment:
     Replaced Mortar








Una Vida 29SJ 391 Room: Room 27 Story: 2nd Story Wall: North Interior Year 2005
Condition
Photo type: Before 82219
Image #: 082219
Catalog #: 85210        Accession #: 791
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor