Wijiji 29SJ 577 Room: Room 33 Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East
Start: 29/10/2008 End: 29/10/2008 Person Days: 0.5
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 33 Story: 1st Story Wall: East Interior Year 2008
Condition
Photo type: Before 84458
Image #: 084458
Catalog #: 93904        Accession #: 811
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (mortar/stone) Poor








Wijiji 29SJ 577 Room: Room 33 Story: 1st Story Wall: East Interior Year 2008
Treatment
Photo type: After 84586
Image #: 084586
Catalog #: 93904        Accession #: 811
Treatment:
Repointing (sq ft): 29.0
Mortar (# buckets): 0.5
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar