Pueblo Bonito 29SJ 387 Room: Room 87 Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
1.0 Outside park Dirt Cans Cups of color
2.0 Purchase Sand Describe Color: Brown
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, North
Start: 20/6/2006 End: 26/6/2006 Person Days: 4.0
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 87 Story: 1st Story Wall: South Interior Year 2006
Condition
Photo type: Before 75854
Image #: 075854
Catalog #: 85200        Accession #: 803
Condition:
Basal Erosion: Poor
Other Conditions:
     Basal Erosion Poor








Pueblo Bonito 29SJ 387 Room: Room 87 Story: 1st Story Wall: South Interior Year 2006
Treatment
Photo type: After 82831
Image #: 082831
Catalog #: 85200        Accession #: 803
Treatment:
Repointing (sq ft): 32.0
Stone replaced (#): 145.0
Mortar (# buckets): 11.0
Treatment comment: Leo H. Chiquito worked in this room. Chinking stones were used in place of the site stones.
Other Treatment:
     Repaired Basal erosion (mortar/stone)








Pueblo Bonito 29SJ 387 Room: Room 87 Story: 1st Story Wall: North Interior Year 2006
Condition
Photo type: Before 75853
Image #: 075853
Catalog #: 85200        Accession #: 803
Condition:
Basal Erosion: Poor
Other Conditions:
     Basal Erosion Poor








Pueblo Bonito 29SJ 387 Room: Room 87 Story: 1st Story Wall: North Interior Year 2006
Treatment
Photo type: After 82830
Image #: 082830
Catalog #: 85200        Accession #: 803
Treatment:
Repointing (sq ft): 9.0
Stone replaced (#): 4.0
Mortar (# buckets): 1.0
Treatment comment: Leo H. Chiquito worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)