Bc 51 29SJ 395 Room: Room 29 Story: 1st Story Year 2007
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Outside park Dirt Duraweld C (1:4)
4.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, North
Start: 15/10/2007 End: 15/10/2007 Person Days: 0.5
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 29 Story: 1st Story Wall: South Interior Year 2007
Condition
Photo type: Before 83561
Image #: 083561
Catalog #: 89999        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 51 29SJ 395 Room: Room 29 Story: 1st Story Wall: South Interior Year 2007
Treatment
Photo type: After 83731
Image #: 083731
Catalog #: 89999        Accession #: 806
Treatment:
Repointing (sq ft): 6.7
Stone replaced (#): 3.0
Mortar (# buckets): 0.25
Treatment comment: Douglas Norberto Sr. worked in this room.








Bc 51 29SJ 395 Room: Room 29 Story: 1st Story Wall: North Interior Year 2007
Condition
Photo type: Before 83560
Image #: 083560
Catalog #: 89999        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 51 29SJ 395 Room: Room 29 Story: 1st Story Wall: North Interior Year 2007
Treatment
Photo type: After 83730
Image #: 083730
Catalog #: 89999        Accession #: 806
Treatment:
Repointing (sq ft): 2.2
Mortar (# buckets): 0.25
Treatment comment: Douglas Norberto Sr. worked in this room.