Pueblo Pintado 29Mc 166 Room: Room 34 A Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East
Start: 3/9/2008 End: 3/9/2008 Person Days: 0.5
 
Overall Comments:



Pueblo Pintado 29Mc 166 Room: Room 34 A Story: 1st Story Wall: South Interior Year 2008
Condition
Photo type: Before 84229
Image #: 084229
Catalog #: 93902        Accession #: 811
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Pueblo Pintado 29Mc 166 Room: Room 34 A Story: 1st Story Wall: South Interior Year 2008
Treatment
Photo type: After 84401
Image #: 084401
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 16.9
Stone replaced (#): 3.0
Mortar (# buckets): 0.5
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)








Pueblo Pintado 29Mc 166 Room: Room 34 A Story: 1st Story Wall: East Interior Year 2008
Condition
Photo type: Before 84228
Image #: 084228
Catalog #: 93902        Accession #: 811
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor








Pueblo Pintado 29Mc 166 Room: Room 34 A Story: 1st Story Wall: East Interior Year 2008
Treatment
Photo type: After 84400
Image #: 084400
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 35.8
Stone replaced (#): 6.0
Mortar (# buckets): 1.5
Treatment comment: Garry Joe worked in this room.
Other Treatment:
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)
     Replaced Stone(s)