Kin Bineola 29SJ 1580 Room: Room 102 Story: 2nd Story Year 2006
Capping Mortars
# of buckets Source Material
2.0 Outside park Dirt Cans Cups of color
1.0 Purchase Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, North
Start: 26/4/2006 End: 26/4/2006 Person Days: 0.5
 
Overall Comments:



Kin Bineola 29SJ 1580 Room: Room 102 Story: 2nd Story Wall: West Interior Year 2006
Documentation
Photo type: Documentation, No Treatment 82416
Image #: 082416
Catalog #: 85197        Accession #: 803
Documentation:








Kin Bineola 29SJ 1580 Room: Room 102 Story: 2nd Story Wall: North Interior Year 2006
Condition
Photo type: Before 82417
Image #: 082417
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 102 Story: 2nd Story Wall: North Interior Year 2006
Treatment
Photo type: After 75779
Image #: 075779
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 6.0
Masonry: 1.0
Stone replaced (#): 4.0
Mortar (# buckets): 0.5
Treatment comment: Harold Suina worked in this room.
Other Treatment:
     Replaced Mortar