Pueblo Pintado 29Mc 166 Room: Room 35 A Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: East, North
Start: 3/9/2008 End: 4/9/2008 Person Days: 1.0
 
Overall Comments:



Pueblo Pintado 29Mc 166 Room: Room 35 A Story: 1st Story Wall: East Interior Year 2008
Condition
Photo type: Before 84218
Image #: 084218
Catalog #: 93902        Accession #: 811
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Pueblo Pintado 29Mc 166 Room: Room 35 A Story: 1st Story Wall: East Interior Year 2008
Treatment
Photo type: After 84404
Image #: 084404
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 14.0
Mortar (# buckets): 2.0
Treatment comment: Robinson Lewis worked on this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)








Pueblo Pintado 29Mc 166 Room: Room 35 A Story: 1st Story Wall: North Interior Year 2008
Condition
Photo type: Before 84217
Image #: 084217
Catalog #: 93902        Accession #: 811
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Pueblo Pintado 29Mc 166 Room: Room 35 A Story: 1st Story Wall: North Interior Year 2008
Treatment
Photo type: After 84403
Image #: 084403
Catalog #: 93902        Accession #: 811
Treatment:
Other Treatment:
     Repaired Basal erosion (mortar/stone)