Bc 51 29SJ 395 Room: Room 1 Story: 1st Story Year 2007
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Outside park Dirt Duraweld C (1:4)
0.5 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South
Start: 15/10/2007 End: 15/10/2007 Person Days: 0.5
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 1 Story: 1st Story Wall: West Interior Year 2007
Condition
Photo type: Before 83540
Image #: 083540
Catalog #: 89999        Accession #: 806
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Bc 51 29SJ 395 Room: Room 1 Story: 1st Story Wall: West Interior Year 2007
Treatment
Photo type: After 83701
Image #: 083701
Catalog #: 89999        Accession #: 806
Treatment:
Repointing (sq ft): 6.0
Stone replaced (#): 11.0
Mortar (# buckets): 0.5
Treatment comment: Paul Tso worked in this room.








Bc 51 29SJ 395 Room: Room 1 Story: 1st Story Wall: South Interior Year 2007
Condition
Photo type: Before 83541
Image #: 083541
Catalog #: 89999        Accession #: 806
Condition:
Other Conditions:
     Basal Erosion (mortar/stone) Poor








Bc 51 29SJ 395 Room: Room 1 Story: 1st Story Wall: South Interior Year 2007
Treatment
Photo type: After 83700
Image #: 083700
Catalog #: 89999        Accession #: 806
Treatment:
Repointing (sq ft): 6.0
Stone replaced (#): 6.0
Mortar (# buckets): 0.5
Treatment comment: Paul Tso worked in this room.