Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 BLM quarry Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East
Start: 12/4/2005 End: 19/4/2005 Person Days: 3.5
 
Overall Comments:



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: West Interior Year 2005
Condition
Photo type: Before 76242
Image #: 076242
Catalog #: 85208        Accession #: 801
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: West Interior Year 2005
Condition
Photo type: Before 76241
Image #: 076241
Catalog #: 85208        Accession #: 801
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: West Interior Year 2005
Treatment
Photo type: After 76198
Image #: 076198
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 16.0
Mortar (# buckets): 3.0
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Replaced Mortar








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: West Interior Year 2005
Treatment
Photo type: After 76199
Image #: 076199
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 16.0
Mortar (# buckets): 3.0
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Replaced Mortar








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: South Interior Year 2005
Condition
Photo type: Before 76351
Image #: 076351
Catalog #: 85208        Accession #: 801
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: South Interior Year 2005
Treatment
Photo type: After 76197
Image #: 076197
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 12.0
Stone replaced (#): 4.0
Mortar (# buckets): 2.0
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Replaced Mortar








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: East Interior Year 2005
Condition
Photo type: Before 76352
Image #: 076352
Catalog #: 85208        Accession #: 801
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: East Interior Year 2005
Condition
Photo type: Before 76240
Image #: 076240
Catalog #: 85208        Accession #: 801
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: East Interior Year 2005
Treatment
Photo type: After 76196
Image #: 076196
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 6.0
Stone replaced (#): 25.0
Mortar (# buckets): 3.0
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Replaced Mortar
     Replaced Stone(s)








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Story: 1st Story Wall: East Interior Year 2005
Treatment
Photo type: After 76195
Image #: 076195
Catalog #: 85208        Accession #: 801
Treatment:
Repointing (sq ft): 6.0
Stone replaced (#): 25.0
Mortar (# buckets): 3.0
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Replaced Mortar
     Replaced Stone(s)








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Year 2005
Backfill
Start: 12/7/2005 End: 12/7/2005 Person days: 1
Comments:
Specific Information

Cubic yards of fill: 4.0
Backfill source type: BLM Quarry
Backfill other:
Cloth barrier type: Geotextile
Cloth barrier other:
Other textile type:
Other textile other:
Other textile purpose:
Drain Information

Inlet:
T: L: Other: Other type:
Joint:
Y: 90: 2 45: 22: Other: Other type:
Drain pipe length: 11 feet      Drain pipe diameter: 6 inches
Avgerage height above geotextile: feet     
Drain pipe enters room through:      Other:
Drain pipe leaves room through: Doorway      Other:
Drain pipe leaves goes to: room 62     
Evaporative Basins

Basin installed
Height above geotextile: 0.0
Basin size:
Capacity: gallons
Wood

Number of pieces buried: none
Note:


Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Wall: Year 2005
Backfill
Photo type: Before Backfill 76197
Image #: 076197
Catalog #: 85208        Accession #: 801








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Wall: Year 2005
Backfill
Photo type: After Backfill 76593
Image #: 076593
Catalog #:        Accession #: 801








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Wall: Year 2005
Backfill
Photo type: After Backfill 76618
Image #: 076618
Catalog #:        Accession #: 801








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 68 Wall: Year 2005
Backfill
Photo type: During Backfill 76128
Image #: 076128
Catalog #:        Accession #: 801