Kin Bineola 29SJ 1580 Room: Room 80 Story: 1st Story Year 2006
Capping Mortars
# of buckets Source Material
2.0 Outside park Dirt Cans Cups of color
1.0 Purchase Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 25/4/2006 End: 25/4/2006 Person Days: 1.0
 
Overall Comments:



Kin Bineola 29SJ 1580 Room: Room 80 Story: 1st Story Wall: South Interior Year 2006
Condition
Photo type: Before 82444
Image #: 082444
Catalog #: 85197        Accession #: 803
Condition:
Mortar Erosion: Poor
Other Conditions:
     Loose or leaning or bulging masonry Poor
     Mortar Erosion Poor








Kin Bineola 29SJ 1580 Room: Room 80 Story: 1st Story Wall: South Interior Year 2006
Treatment
Photo type: After 75774
Image #: 075774
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 6.0
Masonry: 6.0
Stone replaced (#): 8.0
Mortar (# buckets): 1.0
Treatment comment: Leo Chiquito worked in this room.
Other Treatment:
     Replaced Mortar
     Reset Loose, Leaning, Bulging Lintel Stones