Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 60 Story: 2nd Story Year 2005
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 BLM quarry Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, North
Start: 26/4/2005 End: 27/4/2005 Person Days: 1.0
 
Overall Comments:



Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 60 Story: 2nd Story Wall: West Interior Year 2005
Condition
Photo type: Before 76310
Image #: 076310
Catalog #: 85208        Accession #: 801
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 60 Story: 2nd Story Wall: West Interior Year 2005
Treatment
Photo type: After 76185
Image #: 076185
Catalog #:        Accession #:
Treatment:
Masonry: 8.0
Stone replaced (#): 12.0
Mortar (# buckets): 3.0
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar
     Replaced Stone(s)








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 60 Story: 2nd Story Wall: North Interior Year 2005
Condition
Photo type: Before 76311
Image #: 076311
Catalog #: 85208        Accession #: 801
Condition:
Mortar Erosion: Poor
Other Conditions:
     Basal Erosion (mortar/stone) Poor
     Eroded Stone(s) Poor
     Mortar Erosion Poor








Pueblo del Arroyo & Tri-wall 29SJ 1947 Room: Room 60 Story: 2nd Story Wall: North Interior Year 2005
Treatment
Photo type: After 76184
Image #: 076184
Catalog #:        Accession #:
Treatment:
Masonry: 3.5
Stone replaced (#): 4.0
Mortar (# buckets): 1.0
Treatment comment: Ben Charley worked in this room.
Other Treatment:
     Replaced Stone(s)
     Replaced Mortar
     Repaired Basal erosion (mortar/stone)