Pueblo Bonito 29SJ 387 Room: Kiva O Story: 1st Story Year 2007
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
1.0 BLM quarry Clay
Comments:
Walls recorded: South
Start: 21/4/2008 End: 5/5/2008 Person Days: 14.0
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Kiva O Story: 1st Story Wall: South Exterior Year 2007
Condition
Photo type: Before 83983
Image #: 083983
Catalog #: 85204        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Other Conditions:
     Hit / Damaged Wall Poor








Pueblo Bonito 29SJ 387 Room: Kiva O Story: 1st Story Wall: South Exterior Year 2007
Treatment
Photo type: After 83909
Image #: 083909
Catalog #: 85204        Accession #: 806
Treatment:
Stone replaced (#): 34.0
Capping: 13.0
Mortar (# buckets): 1.5
Treatment comment: Robinson Lewis, Leo Chiquito, Harold Suina and Garry Joe all worked in this kiva. This wall was Hit / Damaged by the bobcat.
Other Treatment:
     Repaired Hit / Damaged Wall