Bc 50-Tseh So 29SJ 394 Room: Room 14 Story: 1st Story Year 1973
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South
Start: End: Person Days:
 
Overall Comments:



Bc 50-Tseh So 29SJ 394 Room: Room 14 Story: 1st Story Wall: West Year 1973
Condition
Photo type: Before Vol_71_v71_476-2
Image #: 068343
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Mortar Erosion
     Needs Repointing
     Respalling








Bc 50-Tseh So 29SJ 394 Room: Room 14 Story: 1st Story Wall: West Year 1973
Treatment
Photo type: After Vol_71_v71_477-2
Image #: 068344
Catalog #: 66777        Accession #: 743
Treatment:
Treatment comment: Emergency Stabilization
Other Treatment:
     Replaced Mortar
     Repointing completed
     Respalling Completed








Bc 50-Tseh So 29SJ 394 Room: Room 14 Story: 1st Story Wall: South Year 1973
Condition
Photo type: Before Vol_71_v71_474-2
Image #: 068341
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Loose and cracked Wall
     Loose Stone(s)
     Repatch wall
     Needs Repointing








Bc 50-Tseh So 29SJ 394 Room: Room 14 Story: 1st Story Wall: South Year 1973
Treatment
Photo type: After Vol_71_v71_475-2
Image #: 068342
Catalog #: 66777        Accession #: 743
Treatment:
Treatment comment: Emergency Stabilization
Other Treatment:
     Repatched Wall
     Reset the Stone(s)
     Repointing completed
     Repaired loose and cracked wall