Pueblo Bonito 29SJ 387 Room: Room 175 Story: 3rd Story Year 1981
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, East
Start: 18/5/1981 End: 20/5/1981 Person Days: 7.5
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Room 175 Story: 3rd Story Wall: West Interior Year 1981
Condition
Photo type: Before
Image #: 071513
Catalog #: 94669        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Basal Erosion (stone) Fair
     Mortar Erosion Poor








Pueblo Bonito 29SJ 387 Room: Room 175 Story: 3rd Story Wall: West Interior Year 1981
Treatment
Photo type: After
Image #: 071514
Catalog #: 94669        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar








Pueblo Bonito 29SJ 387 Room: Room 175 Story: 3rd Story Wall: East Interior Year 1981
Condition
Photo type: Before
Image #: 071515
Catalog #: 94669        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Basal Erosion (stone) Fair








Pueblo Bonito 29SJ 387 Room: Room 175 Story: 3rd Story Wall: East Interior Year 1981
Treatment
Photo type: After
Image #: 071516
Catalog #: 94669        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement mortar of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar