Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Year 1980
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: NW Quad, NE Quad, SW Quad, SE Quad
Start: 8/7/1980 End: 18/7/1980 Person Days: 21.5
 
Overall Comments:



Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: NW Quad Interior Year 1980
Condition
Photo type: Before
Image #: 071370
Catalog #: 94664        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Veneer Stone Erosion Poor
     Mortar Erosion Poor








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: NW Quad Interior Year 1980
Treatment
Photo type: After
Image #: 074698
Catalog #: 94664        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Replaced Mortar
     Replaced Veneer stone erosion








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: NW Quad Interior Year 1980
Treatment
Photo type: After
Image #: 071371
Catalog #: 94664        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Replaced Mortar
     Replaced Veneer stone erosion








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: NE Quad Interior Year 1980
Condition
Photo type: Before
Image #: 071366
Catalog #: 94664        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Veneer Stone Erosion Poor
     Mortar Erosion Poor








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: NE Quad Interior Year 1980
Treatment
Photo type: After
Image #: 074696
Catalog #: 94664        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Veneer stone erosion








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: NE Quad Interior Year 1980
Treatment
Photo type: After
Image #: 071367
Catalog #: 94664        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Veneer stone erosion








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: SW Quad Interior Year 1980
Condition
Photo type: Before
Image #: 071368
Catalog #: 94664        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Veneer Stone Erosion Poor
     Mortar Erosion Poor








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: SW Quad Interior Year 1980
Treatment
Photo type: After
Image #: 074697
Catalog #: 94664        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Replaced Veneer stone erosion
     Replaced Mortar








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: SW Quad Interior Year 1980
Treatment
Photo type: After
Image #: 071369
Catalog #: 94664        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Replaced Veneer stone erosion
     Replaced Mortar








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: SE Quad Interior Year 1980
Condition
Photo type: Before
Image #: 071364
Catalog #: 94664        Accession #: 745
Condition:
Mortar Erosion: Poor
Other Conditions:
     Mortar Erosion Poor
     Veneer Stone Erosion Poor








Pueblo Bonito 29SJ 387 Room: Kiva J Story: 1st Story Wall: SE Quad Interior Year 1980
Treatment
Photo type: After
Image #: 071365
Catalog #: 94664        Accession #: 745
Treatment:
Treatment comment: Patching and grouting the wall was done in soil cement of 3 parts soil, 1 part sand and 1 part cement.
Other Treatment:
     Replaced Veneer stone erosion
     Replaced Mortar